TOGETHER, BUILDING VALUE EVERY DAY.
Construction Manager at Risk (CMAR)

Not only are we 100% responsible for the work we subcontract, but we commit to delivering project excellence within a Guaranteed Maximum Price (GMP) with the Construction Manager at Risk (CMAR) delivery method.

As a CMAR, Kitchell is brought into a project early in the design phase as an expert consultant to work side-by-side with the chosen architect to analyze and select materials, systems, and equipment based on cost, benefits, and availability. In balancing the schedule, costs, quality, and scope of the project, decisions can be made to modify the design concept instead of wasting time, effort, and money redesigning and/or modifying completed construction documents. With the CMAR delivery method, we serve as the general contractor following the design phase.

Newest Technology Enables On-the-Spot Commodity Pricing

What can you get for your money? Today’s technology enables us to answer this question in precise detail that would have been unfathomable just three years ago. And instead of a hard-to-comprehend spreadsheet, the DProfiler ™ solution provides an accurate, up to-the-minute visual representation of a cost estimate– based on current commodity prices –of a proposed design. By putting pictures to numbers, clients get a reality check during design conception, saving time and money and averting heartache and frustration right when dreams are just taking flight.