Kitchell performed a study exploring the feasibility of installing onsite solar photovoltaic systems at Cuesta College’s Main and North Campus. The report investigated the electrical demand of the campuses over the pre-pandemic fully operating timeframe of 2018-2020, the existing electrical site conditions, and civil infrastructure to determine the feasibility of installing an onsite solar photovoltaic system. Kitchell was then contracted to provide a similar study incorporating the implementation of carports in the parking lots at each site.